Ghana Water Limited (GWL) has announced it will conduct repair works on the 900mm (36 rdquo;) transmission line at Breman Ahenfo due to perforation. The repair is a result of the drainage construction from the Suame roundabout to Breman Ahenfo on July 12, 2024, which caused damage to the transmission line.