The power grids of the Baltic states are supposed to desync their operation from Belarus’ joint power grid and Russia’s in February 2025. All the interstate power links will be decoupled and the parallel operation as part of the power ring Belarus-Russia-Estonia-Latvia-Lithuania (BRELL) will be terminated.