The NDMA member further said a very difficult operation is going on. Two methods are being used currently, but a third method that is drift method could also be used soon. Currently, 47-meter horizontal drilling has been completed, he said, adding the broken part of the auger machine has to be removed, and the drilled structure has to be kept stable.