The Transmission Company of Nigeria, on Tuesday, said the current load shedding being experienced nationwide is a result of “very low power generation by the Generation Companies (GENCOS) for TCN to wheel through the transmission grid to distribution companies nationwide.” This is as the Company stated that reports that it had reduced the load allocation…