![](https://www.turan.az/mmedia/2021/fb/120600041888.jpg)
Drilling of the first well under the Zhenis offshore project, in which the oil company LUKOIL is involved, is planned for the second half of 2022.According to the materials of the project operator - "Zhenis Operating", the design depth of the well is 3300 m. The water depth in the drilling area is about 98 m. semi-submersible drilling rig (SSDR) "Dede Gorgud" (owned by the Azerbaijani CDC - IF).The tender for the development of a ...